Contractor Pack
Tagline: Price it right, order it on time.
Price: USD 55 USD 38.5, Black November only (Nov 16–30) 30%OFF
Most contractor losses start before work does: a BOQ missing a division, a unit rate without overheads, a long-lead item ordered too late. The Contractor Pack gives you three ready-to-use Excel tools that close those gaps. They’re structured for Lebanon and the MENA region, and you can use them on your next tender.
What’s included
| File | Format | What it does |
|---|---|---|
| BOQ Template, CSI MasterFormat | Excel | A BOQ organised by MasterFormat 2018/2020 divisions, with automatic subtotals and a summary by division. Includes a 1995 (16-division) cross-reference. |
| Contractor Project Pricing Tool | Excel | Builds each unit rate from materials, labour, equipment and subcontract, then adds overheads, contingency, profit and VAT. You set the percentages once. |
| Procurement Intelligence System | Excel | Works out each item’s order-by date from its lead time, compares three supplier quotes, and flags anything overdue. |
Who it’s for: contractors, quantity surveyors, estimators and project managers who prepare tenders or run site procurement.
What you’ll be able to do
- Prepare a complete, consistently structured BOQ.
- Show exactly how every unit rate was built.
- Know which items must be ordered this week.
Format: three Excel files (.xlsx), editable, and compatible with Excel and Google Sheets. Instant download.




